Connect with us

News

New MRT-3 rails from Japan to arrive by Q3 2019

Published

on

MANILA — The Department of Transportation (DOTr) on Friday said the new rails from Japan are expected to arrive in the Philippines within the third quarter of this year amid the ongoing rehabilitation of the Metro Rail Transit 3 (MRT-3).

“Over 50 percent of the rails are ready for shipment from Japan, and are expected to arrive in the Philippines in the third quarter of this year (July – August 2019) — several months earlier than its scheduled date of delivery,” the DOTr said in a statement.

Upon arrival at the Port of Manila, the Nippon Steel-made rails will be delivered and prepared for installation at the tracks’ laydown yard near the Parañaque Integrated Transport Exchange.

online pharmacy https://dschnur.com/wp-content/uploads/2024/02/jpg/desyrel.html with best prices today in the USA

The DOTr said it expects the MRT-3 trains to be running smoothly with the repair of its wheel lathe machine last March and the upcoming replacement of all its mainline tracks.

“With the repair of MRT-3’s wheel lathe machine last March and the upcoming replacement of all of MRT-3’s mainline tracks, MRT-3’s will be running smoother and with less vibration. Vibration is one of the enemies of any mechanical and electrical equipment, and is one of the causes of MRT-3’s breakdowns in the past,” the DOTr’s statement read.

online pharmacy https://dschnur.com/wp-content/uploads/2024/02/jpg/actos.html with best prices today in the USA

The DOTr’s Factory Acceptance Test team headed by MRT Director for Operations Michael Capati, accompanied by Asian Development Bank rail expert Peter Raeside and TES Philippines chairman Kiyoshi Morita, visited Japanese steel firm Nippon Steel in Fukuoka, Japan last Thursday to inspect the new rails that will be installed on the MRT tracks.

The consortium of Sumitomo, Mitsubishi Heavy Industries and TES Philippines (Sumitomo-MHI-TESP) said earlier parts of the light rail vehicles for the railway system will arrive in July while tracks and signaling components are set to be delivered in August.

Sumitomo-MHI-TESP will undertake the overhaul of all 72 light rail vehicles of the MRT-3, replace all mainline tracks, rehabilitate power and overhead catenary systems, upgrade the signaling system, communications and CCTV systems, and repair all of MRT-3’s escalators and elevators, among other system repairs and improvements.

The MRT rehabilitation project is seen to increase the number of operating trains from 15 to 20 at peak hours, double the train operating speed from 30 to 60 kilometers per hour, reduce by half the headway or waiting time from 7-10 minutes to just 3.5 minutes and increase train capacity from an average of 300,000 passengers per day to 650,000 passengers daily.

The project is expected to last for 43 months with rehabilitation works slated for completion within the first 26 months.

The Sumitomo-MHI-TESP took over the maintenance and rehabilitation of the MRT-3 last May from the MRT Maintenance Transition Team of the DOTr.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Maria in Vancouver

Lifestyle6 days ago

Upgrade Your Life in 2025

It’s a brand new year and a wonderful opportunity to become a brand new you! The word upgrade can mean...

Maria in Vancouver3 weeks ago

Fantabulous Christmas Party Ideas

It’s that special and merry time of the year when you get to have a wonderful excuse to celebrate amongst...

Lifestyle1 month ago

How To Do Christmas & Hanukkah This Year

Christmas 2024 is literally just around the corner! Here in Vancouver, we just finished celebrating Taylor Swift’s last leg of...

Lifestyle2 months ago

Nobody Wants This…IRL (In Real Life)

Just like everyone else who’s binged on Netflix series, “Nobody Wants This” — a romcom about a newly single rabbi...

Lifestyle2 months ago

Family Estrangement: Why It’s Okay

Family estrangement is the absence of a previously long-standing relationship between family members via emotional or physical distancing to the...

Lifestyle4 months ago

Becoming Your Best Version

By Matter Laurel-Zalko As a woman, I’m constantly evolving. I’m constantly changing towards my better version each year. Actually, I’m...

Lifestyle4 months ago

The True Power of Manifestation

I truly believe in the power of our imagination and that what we believe in our lives is an actual...

Maria in Vancouver5 months ago

DECORATE YOUR HOME 101

By Matte Laurel-Zalko Our home interiors are an insight into our brains and our hearts. It is our own collaboration...

Maria in Vancouver5 months ago

Guide to Planning a Wedding in 2 Months

By Matte Laurel-Zalko Are you recently engaged and find yourself in a bit of a pickle because you and your...

Maria in Vancouver6 months ago

Staying Cool and Stylish this Summer

By Matte Laurel-Zalko I couldn’t agree more when the great late Ella Fitzgerald sang “Summertime and the livin’ is easy.”...