{"id":86452,"date":"2017-01-23T21:58:09","date_gmt":"2017-01-24T02:58:09","guid":{"rendered":"https:\/\/canadianinquirer.net\/v1\/?p=86452"},"modified":"2017-01-23T21:58:09","modified_gmt":"2017-01-24T02:58:09","slug":"bautista-hopeful-on-completion-of-comelecs-own-building-before-the-end-of-his-term","status":"publish","type":"post","link":"https:\/\/canadianinquirer.net\/v1\/2017\/01\/23\/bautista-hopeful-on-completion-of-comelecs-own-building-before-the-end-of-his-term\/","title":{"rendered":"Bautista hopeful on completion of Comelec&#8217;s own building before the end of his term"},"content":{"rendered":"<figure id=\"attachment_77517\" aria-describedby=\"caption-attachment-77517\" style=\"width: 884px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2016\/06\/Comelec-Chairman-Andres-Andy-Bautista.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-77517\" src=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2016\/06\/Comelec-Chairman-Andres-Andy-Bautista.jpg\" alt=\"Bautista hopeful on completion of Comelec's own building before the end of his term (Photo: Comelec Commissioner James Jimenez\/Twitter)\" width=\"884\" height=\"661\" srcset=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2016\/06\/Comelec-Chairman-Andres-Andy-Bautista.jpg 884w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2016\/06\/Comelec-Chairman-Andres-Andy-Bautista-300x224.jpg 300w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2016\/06\/Comelec-Chairman-Andres-Andy-Bautista-768x574.jpg 768w\" sizes=\"auto, (max-width: 884px) 100vw, 884px\" \/><\/a><figcaption id=\"caption-attachment-77517\" class=\"wp-caption-text\">Bautista hopeful on completion of Comelec&#8217;s own building before the end of his term (Photo: <a href=\"https:\/\/twitter.com\/jabjimenez\">Comelec Commissioner James Jimenez\/Twitter<\/a>)<\/figcaption><\/figure>\n<p>MANILA\u2014Commission on Election (Comelec) Chairman Juan Andres Bautista is hoping that the poll body will have its own building before the end of his term which is on 2022.<\/p>\n<p>He admitted that the matter is being discussed by the commissioners during their en banc sessions.<\/p>\n<p>&#8220;We are discussing this in our en banc meetings. We don\u2019t have a timetable yet but, hopefully, it can be completed (under my administration),\u201d Bautista said in press conference during the launching of the \u201cComelec Village\u201d on Monday.<\/p>\n<p>He noted that they are coordinating with the Department of Public Works and Highways (DPWH) with regard to the construction of their new building including its design and architectural plan.<\/p>\n<p>The poll body noted that Commissioners Christian Robert Lim and Arthur Lim, who are set to retire next year, are likewise hoping that they are still in office when the poll body transfers to its own building which will be located in Pasay City.<\/p>\n<p>\u201cEven the two commissioners retiring in 2018 are joking that they want to experience the new building. But we know it will not be an easy task,\u201d Bautista added.<\/p>\n<p>In 2012, the Comelec was able to acquire the 20,160-sq. m. lot worth PHP1.2 billion at a reclamation area located at Roxas Boulevard corner EDSA in the said city.<\/p>\n<p>The poll body is looking to build a three-building compound with the main structure planned to be an 11-floor building.<\/p>\n<p>Currently, the Comelec&#8217;s main office is located at the Palacio del Gobernador Building in Intramuros, Manila.<\/p>\n<p>Meanwhile, the Comelec and the Comelec Employees\u2019 Union (Comelec-EU) unveiled the five-hectare \u201cComelec Village\u201d, a housing project exclusively for Comelec employees.<\/p>\n<p>The village has 479 housing units and is located in Barangay San Sebastian in Kawit, Cavite.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MANILA\u2014Commission on Election (Comelec) Chairman Juan Andres Bautista is hoping that the poll body will have its own building before &hellip;<\/p>\n","protected":false},"author":33,"featured_media":77517,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1482,16,95],"tags":[10427,14165,11408],"class_list":["post-86452","post","type-post","status-publish","format-standard","has-post-thumbnail","category-breaking","category-news","category-news-ph","tag-commission-on-election","tag-department-of-public-works-and-highways","tag-juan-andres-bautista","mauthors-philippine-news-agency"],"_links":{"self":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/86452","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/users\/33"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/comments?post=86452"}],"version-history":[{"count":0,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/86452\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media\/77517"}],"wp:attachment":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media?parent=86452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/categories?post=86452"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/tags?post=86452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}