{"id":58004,"date":"2015-08-04T13:20:01","date_gmt":"2015-08-04T05:20:01","guid":{"rendered":"https:\/\/canadianinquirer.net\/v1\/?p=58004"},"modified":"2025-01-09T01:17:24","modified_gmt":"2025-01-09T06:17:24","slug":"southern-leyte-gov-seeks-completion-of-maasin-airport","status":"publish","type":"post","link":"https:\/\/canadianinquirer.net\/v1\/2015\/08\/04\/southern-leyte-gov-seeks-completion-of-maasin-airport\/","title":{"rendered":"Southern Leyte gov seeks completion of Maasin Airport"},"content":{"rendered":"<figure id=\"attachment_42781\" aria-describedby=\"caption-attachment-42781\" style=\"width: 300px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/02\/shutterstock_124713472.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-42781\" src=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/02\/shutterstock_124713472-300x200.jpg\" alt=\"shutterstock\" width=\"300\" height=\"200\" srcset=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/02\/shutterstock_124713472-300x200.jpg 300w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/02\/shutterstock_124713472.jpg 1000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-42781\" class=\"wp-caption-text\">shutterstock<\/figcaption><\/figure>\n<p>MAASIN CITY \u2013- The local government in this province is asking the national government to fast track the release of funds for the full development of Maasin Airport, a project that will help unlock local tourism potential.<\/p>\n<p>Governor Roger Mercado admitted that the release of funds for the phase by phase construction works of the airport was often delayed for some unknown reasons.<\/p>\n<p>The main cause the full development of the Maasin Airport failed, was the slow release of funds from the Department of Transportation and Communication (DOTC), according to Mercado. The project was started in 2013.<\/p>\n<p>Two years ago, the standard requirement length for the airport was said to be at least two kilometer, as Mercado conveyed it to the media during a visit to the place, where he was one of the three passengers aboard a 4-seater plane bound for Manila, enroute to Cebu City.<\/p>\n<p>The fund for the Maasin airport development in 2012 was said to be PHP200M as promised by DOTC Secretary Joseph Emilio Abaya.<\/p>\n<p>The runway still needs additional 500 meters to meet the international standard requirement of at least two-kilometer length.<\/p>\n<div style=\"position:absolute;left:-99195px;\"> buy glucophage online <a href=\"https:\/\/www.phamatech.com\/wp-content\/uploads\/2024\/08\/jpg\/glucophage.html\">https:\/\/www.phamatech.com\/wp-content\/uploads\/2024\/08\/jpg\/glucophage.html<\/a> no prescription pharmacy <\/div>\n<p><\/p>\n<p>Nevertheless, he said that Cebu Pacific and Air Asia Zest are okay with the 1.8-kilometer runway length for propeller-driven aircraft.<\/p>\n<div style=\"position:absolute;left:-99195px;\"> buy stendra online <a href=\"https:\/\/www.phamatech.com\/wp-content\/uploads\/2024\/08\/jpg\/stendra.html\">https:\/\/www.phamatech.com\/wp-content\/uploads\/2024\/08\/jpg\/stendra.html<\/a> no prescription pharmacy <\/div>\n<p><\/p>\n<p>The full airport development, according to Mercado, will entice more air travelers to the province and the neighboring town. Tourists prefer boarding at the Maasin airport than to travel for about four hours by van in going to Tacloban Airport to take a flight to Manila.<\/p>\n<p>He said that when the airport here becomes operational, there\u2019s a high percentage of meeting the expectation of the airline operators in the number of passengers per landing either for Cebu or Metro Manila.<\/p>\n<p>\u201cThe Maasin airport and Tacloban airport have a little difference in distance in going to Manila by plane,\u201d Mercado said.<\/p>\n<div style=\"position:absolute;left:-99195px;\"> buy kamagra polo online <a href=\"https:\/\/www.phamatech.com\/wp-content\/uploads\/2024\/08\/jpg\/kamagra-polo.html\">https:\/\/www.phamatech.com\/wp-content\/uploads\/2024\/08\/jpg\/kamagra-polo.html<\/a> no prescription pharmacy <\/div>\n<p><\/p>\n<p>Currently, Mercado is still waiting for the release of the remaining funds from DOTC for the completion of the airport.<\/p>\n<p>\u201cIf ever the additional funds from DOTC would become hopeless to wait, as a recourse to the problem, we will tap the provincial government\u2019s coffer for funds for the concreting of the runway\u2019s 500 meters lacking length,&#8221; he said.<\/p>\n<p>With this in mind, he will inform the DOTC that the airport\u2019s income will go to the provincial government as a return profit of the investment, he said.<\/p>\n<p>Furthermore, if in case it happens that the DOTC funds will arrive sooner before the realization of his plan, then he will be glad if that will happen as soon as possible, he added.<\/p>\n<p><span style=\"font-family: Verdana, Arial, Helvetica, sans-serif;font-size: small\">According to Mercado, it is now incumbent upon for the DOTC to immediately release funds since the full development of the Maasin airport is a key to improve the 15-year-old component city\u2019s economy.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>MAASIN CITY \u2013- The local government in this province is asking the national government to fast track the release of &hellip;<\/p>\n","protected":false},"author":44,"featured_media":42781,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[79],"tags":[],"class_list":["post-58004","post","type-post","status-publish","format-standard","has-post-thumbnail","category-travel","mauthors-philippines-news-agency"],"_links":{"self":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/58004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/comments?post=58004"}],"version-history":[{"count":1,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/58004\/revisions"}],"predecessor-version":[{"id":281380,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/58004\/revisions\/281380"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media\/42781"}],"wp:attachment":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media?parent=58004"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/categories?post=58004"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/tags?post=58004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}