{"id":43521,"date":"2015-02-26T03:19:15","date_gmt":"2015-02-25T19:19:15","guid":{"rendered":"https:\/\/canadianinquirer.net\/v1\/?p=43521"},"modified":"2015-02-26T03:19:15","modified_gmt":"2015-02-25T19:19:15","slug":"replacement-for-damaged-mrt-3-tracks-ongoing-says-exec","status":"publish","type":"post","link":"https:\/\/canadianinquirer.net\/v1\/2015\/02\/26\/replacement-for-damaged-mrt-3-tracks-ongoing-says-exec\/","title":{"rendered":"Replacement for damaged MRT-3 tracks ongoing, says exec"},"content":{"rendered":"<figure id=\"attachment_37128\" aria-describedby=\"caption-attachment-37128\" style=\"width: 604px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/01\/MRT.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-37128 size-large\" src=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/01\/MRT-1024x657.jpg\" alt=\"The Metro Rail Transit (MRT 3) shall implement the new distance-base fare scheme effective January 4, 2015 as displayed on Saturday (January 3, 2015) at the MRT station in Pasay City. (PNA photo by Gil S. Calinga)\" width=\"604\" height=\"388\" srcset=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/01\/MRT-1024x657.jpg 1024w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/01\/MRT-300x192.jpg 300w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/01\/MRT-900x577.jpg 900w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2015\/01\/MRT-600x385.jpg 600w\" sizes=\"auto, (max-width: 604px) 100vw, 604px\" \/><\/a><figcaption id=\"caption-attachment-37128\" class=\"wp-caption-text\">The Metro Rail Transit (MRT 3) shall implement the new distance-base fare scheme effective January 4, 2015 as displayed on Saturday (January 3, 2015) at the MRT station in Pasay City. (PNA photo by Gil S. Calinga)<\/figcaption><\/figure>\n<p>MANILA\u00a0 &#8212; Replacement for the damaged tracks of the Metro Rail Transit Line 3 (MRT-3) finally kicked off Tuesday midnight, a transport official said.<\/p>\n<p>MRT-3 rehabilitation projects consultant Atty. Hernando Cabrera confirmed this by posting a photo of the replacement work being done on the tracks on Twitter.<\/p>\n<p>\u201cSectional rail replacement (pre-welding) activity between Taft (and) Magallanes Stations, MRT-3, 1:10 am, Feb 24 (Tuesday),\u201d his caption on the photo read.<\/p>\n<p>Cabrera said that the same track replacement will be done everyday during a three-hour window time until all 6,000 meters of damaged railway track will be replaced.<\/p>\n<p>To recall, MRT-3 general manager Roman Buenafe earlier made a proposal to shorten MRT-3 operation hours on weekends to allow management to allow enough time for replacement of damaged railway tracks.<\/p>\n<p>This scheme was first carried out last weekend.<\/p>\n<p>The MRT-3 regularly operates from 4:30 a.m. to 11 pm daily but Buenafe\u2019s proposal had operations close from 9:00 p.m. Saturday and open Sunday noon.<\/p>\n<p>Management has yet to give a timetable on when total replacement of tracks will be finished but assured that government was doing its best to make the travel more convenient for its passengers.<\/p>\n<p>Additional hand straps are also going to be added as a precautionary measure to provide passengers with support in case MRT- coaches make sudden stops.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MANILA\u00a0 &#8212; Replacement for the damaged tracks of the Metro Rail Transit Line 3 (MRT-3) finally kicked off Tuesday midnight, &hellip;<\/p>\n","protected":false},"author":44,"featured_media":37128,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1482,1145,95],"tags":[],"class_list":["post-43521","post","type-post","status-publish","format-standard","has-post-thumbnail","category-breaking","category-headline","category-news-ph","mauthors-philippines-news-agency"],"_links":{"self":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/43521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/comments?post=43521"}],"version-history":[{"count":0,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/43521\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media\/37128"}],"wp:attachment":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media?parent=43521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/categories?post=43521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/tags?post=43521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}