{"id":41976,"date":"2015-02-11T23:58:38","date_gmt":"2015-02-11T15:58:38","guid":{"rendered":"https:\/\/canadianinquirer.net\/v1\/?p=41976"},"modified":"2015-02-11T23:58:38","modified_gmt":"2015-02-11T15:58:38","slug":"erc-approves-php-2-3-b-ngcp-malita-matanao-transmission-line-project","status":"publish","type":"post","link":"https:\/\/canadianinquirer.net\/v1\/2015\/02\/11\/erc-approves-php-2-3-b-ngcp-malita-matanao-transmission-line-project\/","title":{"rendered":"ERC approves Php 2.3-B NGCP Malita-Matanao transmission line project"},"content":{"rendered":"<figure id=\"attachment_34133\" aria-describedby=\"caption-attachment-34133\" style=\"width: 1000px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/12\/shutterstock_180605156.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-34133\" src=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/12\/shutterstock_180605156.jpg\" alt=\"shutterstock\" width=\"1000\" height=\"750\" srcset=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/12\/shutterstock_180605156.jpg 1000w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/12\/shutterstock_180605156-300x225.jpg 300w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/12\/shutterstock_180605156-900x675.jpg 900w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><figcaption id=\"caption-attachment-34133\" class=\"wp-caption-text\">shutterstock<\/figcaption><\/figure>\n<p>MANILA &#8212; The Energy Regulatory Commission (ERC) has approved the National Grid Corp. of the Philippines\u2019 (NGCP\u2019s) Malita-Matanao transmission line project, which runs from Davao Occidental to Davao del Sur.<\/p>\n<p>\u201dThe application filed by the NGCP for approval of its Malita &#8211; Matanao 230 kV Transmission Line Project, with prayer for the issuance of a provisional authority, is hereby approved,\u201d the ERC said in a decision.<\/p>\n<p>The project includes Malita\u2019s new substation, an expansion plan for the Matanao substation and the transmission line that will connect the two stations.<\/p>\n<p>It costs a total of Php 2.4 billion, including the related activities to be implemented for the project.<\/p>\n<p>The project cost was adjusted to Php 2.3 billion since the project excludes a transformer, which will be connected to the Davao del Sur Electric Cooperatives, Inc. (DASURECO).<\/p>\n<p>The transmission line will allow DASURECO to get more power from the new San Miguel Consolidated Power Corp.\u2019s (SMCPC) 600-megawatt (MW) Coal Plant in Davao del Sur.<\/p>\n<p>The transmission line is vital for the connection of the 600 MW plant to the Mindanao grid.<\/p>\n<p>\u201dIf the proposed project will not be implemented, SMCPC&#8217;s Coal Plant will not be connected to the Mindanao Grid and there will be no additional generation capacity to the island, totaling to 600 MW,\u201d it said.<\/p>\n<p>Specifically, the NGCP said, if not approved, there will be a lack of transmission line facilities at a rate of 150 MW per year; 150 MW in 2015, 300 MW by 2016, 450 MW by 2017 and 600 MW by 2018.<\/p>\n<p>The NGCP noted that the transmission line will temporarily run at a lower capacity and once completed, then to a higher one.<\/p>\n<p>The SMCPC will pay the connection charge to the NGCP.<\/p>\n<p>The ERC decision did not give details on what would be the effects of the project on the electricity rates of the Mindanao consumers.<\/p>\n<p>According to the ERC document, the NGCP will still have to conduct a bidding for the procurement of materials for the project.<\/p>\n<p>The NGCP is the main grid operator in the country, providing power lines &#8212; which run from power plants to distributors &#8212; in Luzon, Visayas and Mindanao.<\/p>\n<p>Further, the ERC was mandated by the Electric Power Industry Reform Act (EPIRA) to focus on ensuring consumer education and protection and to promote competitive operations in the electricity market.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MANILA &#8212; The Energy Regulatory Commission (ERC) has approved the National Grid Corp. of the Philippines\u2019 (NGCP\u2019s) Malita-Matanao transmission line &hellip;<\/p>\n","protected":false},"author":44,"featured_media":34133,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1482,19],"tags":[],"class_list":["post-41976","post","type-post","status-publish","format-standard","has-post-thumbnail","category-breaking","category-business","mauthors-juzel-l-danganan","mauthors-philippines-news-agency"],"_links":{"self":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/41976","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/comments?post=41976"}],"version-history":[{"count":0,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/41976\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media\/34133"}],"wp:attachment":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media?parent=41976"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/categories?post=41976"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/tags?post=41976"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}