{"id":27855,"date":"2014-10-04T15:03:59","date_gmt":"2014-10-04T07:03:59","guid":{"rendered":"https:\/\/canadianinquirer.net\/v1\/?p=27855"},"modified":"2014-10-04T15:03:59","modified_gmt":"2014-10-04T07:03:59","slug":"dpwh-to-proceed-with-road-repair-in-mandaluyong-and-quezon-city-this-weekend","status":"publish","type":"post","link":"https:\/\/canadianinquirer.net\/v1\/2014\/10\/04\/dpwh-to-proceed-with-road-repair-in-mandaluyong-and-quezon-city-this-weekend\/","title":{"rendered":"DPWH to proceed with road repair in Mandaluyong and Quezon City this weekend"},"content":{"rendered":"<figure id=\"attachment_22735\" aria-describedby=\"caption-attachment-22735\" style=\"width: 1000px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/08\/manila-traffic.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-22735\" src=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/08\/manila-traffic.jpg\" alt=\"Metro Manila traffic (Viet Images \/ Shutterstock)\" width=\"1000\" height=\"664\" srcset=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/08\/manila-traffic.jpg 1000w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/08\/manila-traffic-300x199.jpg 300w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><figcaption id=\"caption-attachment-22735\" class=\"wp-caption-text\">Metro Manila traffic (Viet Images \/ Shutterstock)<\/figcaption><\/figure>\n<p>MANILA &#8212; The Department of Public Works and Highways (DPWH) will undertake reblocking and road repair along EDSA and other national roads in Metro Manila this weekend.<\/p>\n<p>This after the Metropolitan Manila Development Authority (MMDA) has allowed the department to conduct road works in some parts of Quezon City.<\/p>\n<p>DPWH Secretary Rogelio Singson said the repair\/rehabilitation works will start on October 3, Friday at 10p.m. and will be passable to traffic by 5a.m. on October 6, which was earlier declared a regular holiday in observance of Eid-al-Adha.<\/p>\n<p>The following are roads where repair will be undertaken:<\/p>\n<p>Along Araneta Avenue from Calamba Street to Quezon Avenue, Quezon City specifically before and after Maria Clara Street, 2nd Lane, South Bound, with length of 58.50 lineal meters (lm);<\/p>\n<p>Along Fairview Avenue from Winston Street to Puregold, 3rd lane, southbound, with a total length of 76.30 lm;<\/p>\n<p>Along Mindanao Avenue from Old Sauyo Road to Rosal Street, 3rd lane, southbound with a total length of 85.50 lm;<\/p>\n<p>Along C.P. Garcia Avenue, Quezon City specifically Maginhawa Street to E. Jacinto Street, northbound, 3rd lane, with a total length of 51.15 lm; and<\/p>\n<p>Along Congressional Avenue from April Street to Ayshire, 1st lane, westbound, with a total length of 58.50 lineal meters and area of 198.90 square meters.<\/p>\n<p>The DPWH has requested that the concrete re-blocked area be allowed to attain the three (3) days curing period in accordance with the approved design and specification.<\/p>\n<p>Singson explained that newly paved road prematurely opened or subjected to a moving load without attaining the prescribed curing period of three (3) days may result to an early deterioration of concrete pavement.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MANILA &#8212; The Department of Public Works and Highways (DPWH) will undertake reblocking and road repair along EDSA and other &hellip;<\/p>\n","protected":false},"author":44,"featured_media":22735,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1482,95],"tags":[],"class_list":["post-27855","post","type-post","status-publish","format-standard","has-post-thumbnail","category-breaking","category-news-ph","mauthors-philippines-news-agency"],"_links":{"self":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/27855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/comments?post=27855"}],"version-history":[{"count":0,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/27855\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media\/22735"}],"wp:attachment":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media?parent=27855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/categories?post=27855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/tags?post=27855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}