{"id":25065,"date":"2014-09-08T18:47:30","date_gmt":"2014-09-08T10:47:30","guid":{"rendered":"https:\/\/canadianinquirer.net\/v1\/?p=25065"},"modified":"2014-09-08T18:47:30","modified_gmt":"2014-09-08T10:47:30","slug":"expect-more-mrt-problems","status":"publish","type":"post","link":"https:\/\/canadianinquirer.net\/v1\/2014\/09\/08\/expect-more-mrt-problems\/","title":{"rendered":"Expect more MRT problems"},"content":{"rendered":"<figure id=\"attachment_23999\" aria-describedby=\"caption-attachment-23999\" style=\"width: 300px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/08\/MRT3_Shaw2-URBANRAIL.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-23999\" src=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/08\/MRT3_Shaw2-URBANRAIL-300x230.jpg\" alt=\"MRT3 Shaw Boulevard Station (Photo courtesy of UrbanRail)\" width=\"300\" height=\"230\" srcset=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/08\/MRT3_Shaw2-URBANRAIL-300x230.jpg 300w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2014\/08\/MRT3_Shaw2-URBANRAIL.jpg 550w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-23999\" class=\"wp-caption-text\">MRT3 Shaw Boulevard Station (Photo courtesy of UrbanRail)<\/figcaption><\/figure>\n<p>MANILA &#8212;\u00a0A local government unit representative warned the pubic to brace for more breakdowns and accidents related to the Metro Rail Transit (MRT) given that proposed improvements will take years to complete.<\/p>\n<p>According to Valenzuela City Rep. Sherwin Gatchalian, the new trains for the MRT-3 are set to arrive in 2016, while the new MRT-7 will be completed by 2018.<\/p>\n<p>In the meantime, the Deparment of Transportation and Communications (DOTC) short-term solution to the public\u2019s woes regarding the MRT is to purchase coaches from CNR Dalian Locomotive and Rolling Stock Co. Ltd., something that the MRT Holdings (MRTH) is against. According to the MRTH the said suppliers do not have sufficient experience in such equipment which may lead to more problems.<\/p>\n<p>MRTH owns the MRT, while Autre Porte Technique Global Inc. (APT Global) is the one responsible for maintaining the train system.<\/p>\n<p>\u201cThe solution to the safety issue is to get a qualified maintenance provider that is financially and technically capable,\u201d said MRTH spokesman David Narvasa regarding the upgrade as an immediate solution.<\/p>\n<p>Meanwhile, president and chief executive officer of Comm Builders and Technology (CB&amp;T) Philippines, said that the breakdowns of the MRT-3 does not come as a surprise given that the trains are already exhausted beyond their 1.5 million-kilometer life span.<\/p>\n<p>\u201cWe have warned against many deteriorating parts and obsolete spare parts of the various systems,\u201d Bacar said. \u201cThe traction motors of the MRT are now beyond 1.6, 1.7 million,\u201d he added.<\/p>\n<p>He noted that the glitch that halted the operations of the MRT last August 23 is already a sign of deterioration. Bacar added that the breakdowns are caused by worn out traction motors.<\/p>\n<p>\u201cIt was one of the findings in our system audit that we conducted when we assumed as interim maintenance contractor. We\u2019re now in the third quarter of 2014, so the traction motor has logged in hundreds of thousands of kilometers more. It\u2019s really no wonder that we\u2019re having all these trains stalling incidents,\u201d he said.<\/p>\n<p>Bacar said that the MRT\u2019s aging systems are in dire need of actual upgrades given that the transport system was not maintained well by its former sub-contractor Sumitomo-TES Philippines from 1999 to 2012.<\/p>\n<p>On the other hand, a group of consumers yesterday called the government\u2019s attention to look into long-term and lasting solutions to the MRT-related problems.<\/p>\n<p>According to the National Coalition of Filipino Consumers (NCFC), the \u201cMRT challenge\u201d of the government officials is not the proper solution to determine the problems of the train system.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MANILA &#8212;\u00a0A local government unit representative warned the pubic to brace for more breakdowns and accidents related to the Metro &hellip;<\/p>\n","protected":false},"author":44,"featured_media":23999,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[95],"tags":[1349,7720],"class_list":["post-25065","post","type-post","status-publish","format-standard","has-post-thumbnail","category-news-ph","tag-mrt","tag-problems","mauthors-lei-fontamillas","mauthors-philippine-canadian-inquirer"],"_links":{"self":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/25065","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/comments?post=25065"}],"version-history":[{"count":0,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/25065\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media\/23999"}],"wp:attachment":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media?parent=25065"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/categories?post=25065"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/tags?post=25065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}