{"id":235990,"date":"2019-10-28T19:39:27","date_gmt":"2019-10-28T23:39:27","guid":{"rendered":"https:\/\/canadianinquirer.net\/v1\/?p=235990"},"modified":"2019-10-30T22:54:06","modified_gmt":"2019-10-31T02:54:06","slug":"samuel-de-champlain-bridge-corridor-project-nears-completion","status":"publish","type":"post","link":"https:\/\/canadianinquirer.net\/v1\/2019\/10\/28\/samuel-de-champlain-bridge-corridor-project-nears-completion\/","title":{"rendered":"Samuel De Champlain Bridge Corridor Project nears completion"},"content":{"rendered":"<div class=\"mceTemp\"><\/div>\n<figure id=\"attachment_236118\" aria-describedby=\"caption-attachment-236118\" style=\"width: 1280px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2019\/10\/1280px-Samuel_de_Champlain_Bridge_from_east.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-236118\" src=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2019\/10\/1280px-Samuel_de_Champlain_Bridge_from_east.jpg\" alt=\"\" width=\"1280\" height=\"648\" srcset=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2019\/10\/1280px-Samuel_de_Champlain_Bridge_from_east.jpg 1280w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2019\/10\/1280px-Samuel_de_Champlain_Bridge_from_east-300x152.jpg 300w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2019\/10\/1280px-Samuel_de_Champlain_Bridge_from_east-768x389.jpg 768w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2019\/10\/1280px-Samuel_de_Champlain_Bridge_from_east-1024x518.jpg 1024w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><figcaption id=\"caption-attachment-236118\" class=\"wp-caption-text\">FILE: Samuel De Champlain Bridge as viewed from Brossard (<a href=\"https:\/\/commons.wikimedia.org\/w\/index.php?curid=80483346\">Photo By Coasterlover1994 &#8211; Own work, CC BY-SA 4.0<\/a>)<\/figcaption><\/figure>\n<div class=\"row\">\n<div class=\"col-md-auto\">\n<p><strong>Montr\u00e9al, Quebec, October 28, 2019<\/strong><strong>\u00a0<\/strong>\u2013 Signature on the St. Lawrence (SSL), the consortium responsible for construction and operation of the Samuel De Champlain Bridge Corridor today provided an update on the status of remaining elements of the project. The corridor includes the Samuel De Champlain Bridge, the \u00cele-des-S\u0153urs Bridge and the federal portions of Highway 15 and Highway 10 connecting the crossing to the Greater Montreal area transportation network.<\/p>\n<p>SSL outlined the significant progress which has been made since the opening of the bridge to traffic last summer.\u00a0 However, SSL confirmed they will not be able to complete all remaining elements of the corridor by October 31. SSL indicated that all remaining elements will be delivered by the end of fall with the exception of winter sensitive finishing works like paint touch-ups and landscaping.<\/p>\n<p>Important advancements have been made on the central corridor of the bridge which will be used for the R\u00e9seau express metropolitan and testing the architectural lighting system on the bridge. On Highway 15 North, traffic is now flowing on two of three lanes between \u00cele-des-S\u0153urs and Atwater and a number of reconfigured access points to the corridor have been re-opened.<\/p>\n<p>Work has also progressed on the multi-use path which will provide a secure crossing for pedestrians and cyclists year-round. The final connection of the new path to the region\u2019s existing active transportation network will take place in the coming weeks so that it can open to the public later this fall.<\/p>\n<\/div>\n<\/div>\n<div>\n<h2>Quick facts<\/h2>\n<ul>\n<li>The Samuel De Champlain Bridge was officially inaugurated on June 28, 2019.<\/li>\n<li>The new \u00cele-des-S\u0153urs Bridge that links Montreal and \u00cele-des-S\u0153urs within the Samuel De Champlain Bridge corridor opened to traffic on November 12, 2018. Its multi-use path is accessible for pedestrians and cyclists.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Montr\u00e9al, Quebec, October 28, 2019\u00a0\u2013 Signature on the St. Lawrence (SSL), the consortium responsible for construction and operation of the &hellip;<\/p>\n","protected":false},"author":44,"featured_media":236118,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18,16],"tags":[],"class_list":["post-235990","post","type-post","status-publish","format-standard","has-post-thumbnail","category-news-ca","category-news","mauthors-infrastructure-canada","mauthors-government-of-canada"],"_links":{"self":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/235990","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/comments?post=235990"}],"version-history":[{"count":3,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/235990\/revisions"}],"predecessor-version":[{"id":236120,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/235990\/revisions\/236120"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media\/236118"}],"wp:attachment":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media?parent=235990"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/categories?post=235990"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/tags?post=235990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}