{"id":186241,"date":"2018-10-21T02:52:18","date_gmt":"2018-10-21T06:52:18","guid":{"rendered":"https:\/\/canadianinquirer.net\/v1\/?p=186241"},"modified":"2018-10-21T02:52:18","modified_gmt":"2018-10-21T06:52:18","slug":"p63-8-m-road-concreting-project-iloilo-town-begins","status":"publish","type":"post","link":"https:\/\/canadianinquirer.net\/v1\/2018\/10\/21\/p63-8-m-road-concreting-project-iloilo-town-begins\/","title":{"rendered":"P63.8-M road concreting project in Iloilo town begins"},"content":{"rendered":"<figure id=\"attachment_186242\" aria-describedby=\"caption-attachment-186242\" style=\"width: 415px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2018\/10\/capsule.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-186242\" src=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2018\/10\/capsule.jpg\" alt=\"\" width=\"415\" height=\"260\" srcset=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2018\/10\/capsule.jpg 415w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2018\/10\/capsule-300x188.jpg 300w\" sizes=\"auto, (max-width: 415px) 100vw, 415px\" \/><\/a><figcaption id=\"caption-attachment-186242\" class=\"wp-caption-text\">FILE: Laying of the time capsule during the groundbreaking of the PHP63.8 million Mina-Jelicuon- Amiroy road on Saturday, October 20. (Photo by Capitol PIO via PNA)<\/figcaption><\/figure>\n<p><strong>ILOILO CITY<\/strong>\u00a0&#8212; The concreting of the Mina-Jelicuon- Amiroy road in Mina, Iloilo has started following the groundbreaking of the project led by Governor Arthur Defensor Sr. on Saturday.<\/p>\n<p>Around PHP63.8 million has been allotted for the concreting of the road, through the Conditional Matching Grant to Provinces (CMGP) of the Department of the Interior and Local Government (DILG).<\/p>\n<p>In his speech, Mayor Rey Grabato of Mina stressed the importance of the project in improving the access to transportation of the people and the delivery of their products.<\/p>\n<p>\u201cWe hope that the project will be completed on-time,\u201d he said, adding that its completion would immediately provide convenience to the public.<\/p>\n<p>The Mina-Jelicuon-Amiroy road has a length of 3.78 kilometers. The project is being carried out by Supreme ABF Construction and Construction Supply, Inc.<\/p>\n<p>The rehabilitation works include the concreting of road, such as earthworks, sub-base and base course, concrete pavement, drainage and slope protection structures and road signs, among others. All these works are expected to be completed in April next year.<\/p>\n<p>However, Defensor said that Phase 2 of the project would be implemented next year to complete the road network up to the nearby village of Cabugao, New Lucena, Iloilo.<\/p>\n<p>He said the budget for the project will be PHP21.5 million, also sourced from the CMGP.<\/p>\n<p>Defensor reiterated his desire to ensure the concreting of all the provincial roads in the province before he steps down from office next year.<\/p>\n<p>Iloilo province is a consistent awardee for the DILG\u2019s Seal of Local Good Governance (SGLG), which was why it has availed of the CMGP program.<\/p>\n<p>Just recently, the province obtained the much coveted \u201cseal\u201d for the fourth straight year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ILOILO CITY\u00a0&#8212; The concreting of the Mina-Jelicuon- Amiroy road in Mina, Iloilo has started following the groundbreaking of the project &hellip;<\/p>\n","protected":false},"author":44,"featured_media":186242,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16,95],"tags":[],"class_list":["post-186241","post","type-post","status-publish","format-standard","has-post-thumbnail","category-news","category-news-ph","mauthors-cindy-ferrer","mauthors-philippine-news-agency"],"_links":{"self":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/186241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/comments?post=186241"}],"version-history":[{"count":0,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/186241\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media\/186242"}],"wp:attachment":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media?parent=186241"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/categories?post=186241"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/tags?post=186241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}