{"id":149249,"date":"2018-01-27T20:54:20","date_gmt":"2018-01-28T01:54:20","guid":{"rendered":"https:\/\/canadianinquirer.net\/v1\/?p=149249"},"modified":"2018-01-27T20:54:20","modified_gmt":"2018-01-28T01:54:20","slug":"dpwh-to-build-8-bridges-in-calabarzon","status":"publish","type":"post","link":"https:\/\/canadianinquirer.net\/v1\/2018\/01\/27\/dpwh-to-build-8-bridges-in-calabarzon\/","title":{"rendered":"DPWH to build 8 bridges in Calabarzon"},"content":{"rendered":"<figure id=\"attachment_99620\" aria-describedby=\"caption-attachment-99620\" style=\"width: 415px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2017\/04\/IMG_4748.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-99620\" src=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2017\/04\/IMG_4748.jpg\" alt=\"FILE: In a statement, Project Manager Estrella Villar of DPWH-Unified Project Management Office for Region 4-A, said the building of viaducts was under its Bridge Construction Replacement Project (BCRP) Contract Package 4. (Photo: Philippine News Agency)\" width=\"415\" height=\"260\" srcset=\"https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2017\/04\/IMG_4748.jpg 415w, https:\/\/canadianinquirer.net\/v1\/wp-content\/uploads\/2017\/04\/IMG_4748-300x188.jpg 300w\" sizes=\"auto, (max-width: 415px) 100vw, 415px\" \/><\/a><figcaption id=\"caption-attachment-99620\" class=\"wp-caption-text\">FILE: In a statement, Project Manager Estrella Villar of DPWH-Unified Project Management Office for Region 4-A, said the building of viaducts was under its Bridge Construction Replacement Project (BCRP) Contract Package 4. (Photo: Philippine News Agency)<\/figcaption><\/figure>\n<p><strong>MANILA \u2014<\/strong>\u00a0Eight bridges will be constructed in Laguna, Batangas, and Quezon this year, the Department of Public Works and Highways (DPWH) said Friday.<\/p>\n<p>In a statement, Project Manager Estrella Villar of DPWH-Unified Project Management Office for Region 4-A, said the building of viaducts was under its Bridge Construction Replacement Project (BCRP) Contract Package 4.<\/p>\n<p>She said that Notice of Award (NOA) had been issued to the bid winning contractor of the projects which would be implemented under design-and-build scheme.<\/p>\n<p>Bridge projects in Laguna include the 35-lineal meter Nanguna Bridge along Rizal Boundary-Famy-Quezon Road, the 21-lineal meter Sala Bridge along Manila South Road (MSR), and the 30-lineal meter Bay 2 Bridge along Calamba-Sta. Cruz-Famy Junction Road.<\/p>\n<p>It will also cover the construction of the bridges in Quezon including the 60-lineal meter San Francisco, 42-lineal meter San Miguel Dau and Cogorin Bridges along MSR Jct.-Lopez Cabanatuan Road, and the 42-lineal meter Sangirin Bridge along Quezon-Alabat-Perez Road.<\/p>\n<p>DPWH will also construct the 15-lineal meter Sta. Maria Bridge along Talisay-Laurel-Agoncillo Road.<\/p>\n<p>On the other hand, Villar said that the contract perfection for the project package was on-going.<\/p>\n<p>The civil works are projected to start before the second quarter of 2018.\u00a0<em><strong>(PR)<\/strong><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>MANILA \u2014\u00a0Eight bridges will be constructed in Laguna, Batangas, and Quezon this year, the Department of Public Works and Highways &hellip;<\/p>\n","protected":false},"author":33,"featured_media":99620,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16,95],"tags":[14312,13431,3118],"class_list":["post-149249","post","type-post","status-publish","format-standard","has-post-thumbnail","category-news","category-news-ph","tag-bridges","tag-calabarzon","tag-dpwh","mauthors-philippine-news-agency"],"_links":{"self":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/149249","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/users\/33"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/comments?post=149249"}],"version-history":[{"count":0,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/posts\/149249\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media\/99620"}],"wp:attachment":[{"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/media?parent=149249"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/categories?post=149249"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/canadianinquirer.net\/v1\/wp-json\/wp\/v2\/tags?post=149249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}